Respuesta :
1) a) Gravity
2) 28.8 J
3) 5.6 m/s
4) 6.0 m/s
Explanation:
1)
When the block is sliding down along the ramp, we have only two forces acting on it:
- The force of gravity, whose direction is always vertically downward
- The normal reaction of the plane on the block, which is perpendicular to the ramp itself
The work done by a force on an object is given by:
[tex]W=Fd cos \theta[/tex]
where F is the magnitude of the force, d is the displacement of the object, [tex]\theta[/tex] the angle between the direction of the force and of the displacement
From the equation, we observe that:
- The force of gravity acts at an angle of [tex]\theta=90-59.3^{\circ}=30.7^{\circ}[/tex] with respect to the direction of motion of the block, so the work done by gravity is non-zero
- The normal reaction, however, is perpendicular to the direction of motion of the block, so [tex]\theta=90^{\circ}[/tex]; this means that [tex]cos \theta=0[/tex], so the normal reaction does no work on the block.
Therefore, the only force that does non-zero work is
a) gravity
2)
The total work done on the block as it slides down is just the net work done by gravity (because the normal force does no work), so it is given by:
[tex]W=Fd cos \theta[/tex]
where:
[tex]F=mg[/tex] is the force of gravity, where
m = 1.85 kg is the mass of the block
[tex]g=9.8 m/s^2[/tex] is the acceleration of gravity
d = 1.85 m is the displacement of the block
[tex]\theta=30.7^{\circ}[/tex] is the angle between the direction of the force and of the displacement
Substituting into the equation, we find the work done:
[tex]W=mgd cos \theta=(1.85)(9.8)(1.85)(cos 30.7^{\circ})=28.8 J[/tex]
3)
In order to find the speed of the block after covering 1.85 m, we can use the work-energy theorem, which states that the work done on an object is equal to its change in kinetic energy:
[tex]W=K_f - K_i = \frac{1}{2}mv^2-\frac{1}{2}mu^2[/tex]
where:
[tex]W=28.8 J[/tex] is the work done on the block
m = 1.85 kg is the mass of the block
u = 0 is the initial speed of the block (it starts from rest)
v is the final speed of the block
Solving for v, we can find the final speed of the block, that is:
[tex]v=\sqrt{\frac{2W}{m}}=\sqrt{\frac{2(28.8)}{1.85}}=5.6 m/s[/tex]
4)
In this case:
- The displacement of the block is d = 1.91 m
Therefore, the work done on the block by gravity is:
[tex]W=mgd cos \theta=(1.85)(9.8)(1.91)(cos 30.7^{\circ})=29.8 J[/tex]
- The initial speed of the block is u = 2.00 m/s
So, the equation of the work-energy theorem becomes
[tex]W=\frac{1}{2}mv^2-\frac{1}{2}mu^2[/tex]
And since the mass of the block is
m = 1.85 kg
Solving for v, we find new final speed of the block:
[tex]v=\sqrt{u^2+\frac{2W}{m}}=\sqrt{(2.00)^2+\frac{2(29.8)}{1.85}}=6.0 m/s[/tex]