In an ore-mixing operation, a bucket full of ore is suspended from a traveling crane which moves along a stationary bridge. the bucket is to swing no more than 20 ft horizontally when the crane is brought to a sudden stop. determine the maximum allowable speed v of the crane. (round the final answer to two decimal places.