1.
To formula to calculate the Work done is given by,
Work done = Force × distance
Here we have ,
Substitute the required vlaues
Work done = 200* 2.5
Work done = 500 J
2.
Given ,
distance = 5m
force= 100 N
so,
Work done = 100 * 5
= 500 J
3.
Potential Energy is equal to the work done by the body. Hence in both the cases, the work done is 500 J. So, the increase in potential energy in each case is 500 J.
[tex][/tex]