4 Sharon can shovel 40 feet of sidewalk in 20 minutes if the snow is 4 inches deep. Shirley needs 30 minutes to do the same job. How long will it take them together to shovel 40 feet of sidewalk with snow 4 inches deep?

Respuesta :

Given:

Time Sharon take to complete the task = 20 minutes

Time Shirley take to complete the task = 30 minutes

Therefore:

let x = time it will take both to complete the task

We have the equation:

[tex]\frac{1}{20}+\frac{1}{30}=\frac{1}{x}[/tex]

Multiply to both sides by x:

[tex]\frac{x}{20}+\frac{x}{30}=\frac{1}{x}x[/tex]

Simplify:

[tex]\begin{gathered} \frac{x\cdot30+x\cdot20}{(20)(30)}=1 \\ \frac{30x+20x}{600}=1 \\ \frac{50x}{600}=1,\text{ simplify} \\ \frac{x}{12}=1 \\ 12\cdot\frac{x}{12}=1\cdot12 \\ x=12 \end{gathered}[/tex]

Answer: 12 minutes