The lead time of the actual batch will be in
This refers to the amount of time which is taken for a processor to run a procedure and return a result.
We can see that a batch of 1000 is split so that they each have 10 smaller batches which has an equal size of 100 each, then if the processing time is 2 mins per machine and the set up time is 30 mins.
Hence, when this batch is processed over a serial line of 5 machines, then the lead time of the actual batch would be 2950 in minutes
Read more about processing time here:
https://brainly.com/question/18444145