You schedule production of communications chips. After the chips are produced, they go to the QC department, where each chip must pass a 2-hour test. Over the past year, 5.0% of the chips have failed this test. You wish to choose a batch size that will yield as close as possible to 1,000 good chips, on average. Which of the following is the best batch size?