Respuesta :

Answer:

250

Step-by-step explanation:

There is a 200 start up cost plus 50 per month

Cost = 200 + 50m  where m is the number of months

We have 1 month

Cost = 200 +50(1)

Cost = 250

Answer:

250

Hope this helps