Answer:
Alternative 2
Explanation:
Calculation to determine Which alternative should be selected based on this information
Item Alt. 1 Alt. 2
Alt. 1 Alt. 2
Projected revenue $100,000 $125,000
Unit-level costs (20,000) (30,000)
Batch-level costs (20,000) (25,000)
Product-level costs (15,000) (15,000)
Facility-level costs (10,000) (10,000)
Profit $ 35,000 $ 45,000
Thereforer Based on the above calculation the alternative that should be selected based on this information will be ALTERNATIVE 2 because it has a higher profit of the amount of $45,000