Answer:
Step-by-step explanation:
drain empties 1/10 of the desired amount per minute
pump fills 1/14 of the desired amount per minute
when both are active, the net drain is 1/10-1/14 = 1/35 of the desired amount per minute
It takes 35 minutes to reach the cut-off level.