Respuesta :
Answer:
1. The indirect production costs allocated to each product with the ABC system:
Senior Basic Deluxe Total
Total indirect production cost $25,250 $26,600 $73,550 $125,400
2. The indirect production costs allocated to each product with direct labor costs:
Senior Basic Deluxe Total
Total indirect production cost $72,730 $18,810 $33,860 $125,400
3. I repose much more confidence in the product costs according to requirement 1.
Explanation:
a) Data and Calculations:
Activity Cost Driver
Materials handling
Direct-materials cost
Engineering Engineering
Senior Basic Deluxe Total
Direct-materials cost $25,000 $ 60,000 $135,000 $220,000
Direct-labor cost $14,546 $ 3,762 $ 6,772 $25,080
Kilowatt hours 230,000 220,000 100,000 550,000
Engineering change notices 21 20 69 110
Indirect production costs:
Materials handling $ 15,400 $15,400/$220,000 = $0.07
Engineering 99,000 $99,000/110 = $900
Power 11,000 $11,000/550,000 = $0.02
Total indirect production cost $125,400
Overhead Senior Basic Deluxe
Rates
Materials handling $0.07 $1,750 $4,200 $9,450
Engineering $900 18,900 18,000 62,100
Power $0.02 4,600 4,400 2,000
Total indirect production cost $25,250 $26,600 $73,550
Allocation based on direct labor costs:
Predetermined rate = $5 per direct labor cost.
Senior Basic Deluxe Total
Total indirect production cost $72,730 $18,810 $33,860 $125,400