Answer:
a. Material procured for the construction of theme park
b. The area was cleaned and barriers were removed for the machinery to reach the site.
c. The bulldozer was run over the site and all the broken walls were demolished
d. The construction work started and paint was done.
e. The machinery was removed after the work done.
Explanation:
The site preparation is an important task which is done before any construction work is started. The area is cleaned so that the machinery can reach the site and stay at the work place. The machinery then demolished and smoothens the site area so that the new construction work can be done with ease without any barrier.