contestada

2. A force of 50 N is applied to the object for a distance of 2.0 m. Assume that object(the mass of the object is 3kg)
was at rest at the beginning, what speed did it achieved because of the work done on it? (Hint:
Calculate the works performed by the force first.)
I figured that is 8.2m/S,I am just not sure can anyone help me i much appreciate it.​