Answer:
Overhead allocated to Job XZ3275 $330.39
Explanation:
The computation of the overhead allocation is as follows;
But before that overhead rates is as follows
Activity rate = Estimated overhead cost ÷ Expected cost driver
Activity Cost pool Activity based overhead rate
Loading and unloading $1.02 per piece
($91,000 ÷ 89,500)
Travel $0.79 per mile
($457,000÷ 579,000 miles)
Logistics $26.69 per hour
($75,000 ÷ 2810 hours)
Now the overhead allocation is
Loading and unloading (150 pieces × $1.02 per piece) $152.51
Travel (200 miles × $0.79 per mile) $157.86
Logistics (0.75 hours × $26.69 per hour) $20.02
Overhead allocated to Job XZ3275 $330.39