Answer:
Total cost will be $1140
Explanation:
We have given direct material cost = $540
Direct labor cost = $400
And overhead allocation is 50 % of direct labor cost
So overhead allocation = 50 % of $400 = $200
We have to find the total cost assigned to the job
So total cost = direct material cost + direct labor cost + overhead allocation = $540 + $400 + $200 = $1140
So total cost will be $1140