Answer:
$3.6
Explanation:
The computation of the predetermined overhead rate is shown below:
Predetermined overhead rate = (Total estimated manufacturing overhead) ÷ (estimated direct labor costs)
= $1,584,000 ÷ $440,000
= $3.6
It shows a relationship between the estimated manufacturing overhead cost and the estimated direct labor cost so that the correct overhead rate can be computed