Answer:
total ending WIP value 39,334.20
transferred-out 432.078.00
Explanation:
Ending work in proces inventory
we multiply the equivalent units by the cost per equivlent unit
materials 2,200 x 15.26 = 33,572
converion 940 x 6.13 = 5,762.2
then, we add them to get thetotal value of the ending WIP
total ending WIP value 39,334,2
for the transferred out, we add both equivalent cost as this are complete.
And multiply by the whole amount 20,200
trasnferred out: 20,200 x (15.26 + 6.13) = 432.078