The pipeline will run 1,100 miles, from the Sangachal terminal near Baku, the capital of Azerbaijan, through Georgia and to the Turkish Mediterranean port of Ceyhan.
The pipeline runs 1,100 miles, from the Sangachal terminal near Baku, the capital of Azerbaijan, through Georgia and to the Turkish Mediterranean port of Ceyhan.